Assessment of factors influencing performance of road construction projects in Uganda: a case study of ministry of works and transport
(Kyambogo University, 2020-02)
The road construction projects in Uganda suffer from many problems and complex issues in performance such as; cost, time, scope and quality. The aim of this study was to assess the factors influencing performance of road ...
Assessing the applicability of earned value management Technique in enhancing performance of construction Projects in Uganda: a case of Kampala city
(Kyambogo University, 2021-07)
Monitoring is the most important component in project management. It deals with
measuring performance of a project at certain time intervals and reports that
performance to the organization for process control. Any project ...
Water availability trends across water management zonesin Uganda
(Atmospheric Science Letters, 2021-06-21)
This study assessed trends in gridded (0.25° × 0.25°) Climate Forecast System Reanalysis (CFSR) precipitation, potential evapotranspiration (PET), and precipitation minus PET (PMP) across the four water management zones ...
Investigating implementation strategies towards elimination of structural failure of buildings in Uganda: a case study of Kampala city
(Kyambogo University, 2021-08)
In Kampala City, the failure of buildings has occurred frequently leading to increase
in the spate of building collapse that have claimed many lives of people. In the past
three years, Kampala has recorded quite a number ...
Impact of construction contract type on project time and cost performance in Ugandan local governments: a case of Kiryandongo district
(Kyambogo University [unpublished work], 2023-08)
The construction contract describes the number of works, obligations, rights, and highlighting risks between parties. The inability to fulfill the responsibilities described in the contract on time and budget has worsened ...
Changes in extreme precipitation over Mpologoma catchment in Uganda, East Africa
(Heliyon, 2023-02-17)
Changes of five Extreme Precipitation Indices (EPIs) over Mpologoma catchment were examined.
The EPIs were obtained from the long-term (1948–2016) gridded (0.25◦ × 0.25◦ ) Princeton
Global Forcing (PGF) daily precipitation ...